Shutdown and turnaround crews
Turnaround crews,
ready on day one.
Turnaround crews from Pakistan, qualified to your procedures, covered by standby workers and working from the first shift.
Government of Pakistan licence 3131/RWP
Send your window- From requirement to a full refinery turnaround crew on site in Türkiye.
- 24 days
- Workers for a refinery turnaround in Kuwait, all on site before the shutdown began.
- 180
The turnaround crew
Every trade you need,
in one crew.
We build the crew discipline by discipline from your work packs, with supervision in the same intake.
-
Mechanical
Pipe fitters, mechanical and maintenance technicians for exchangers, pumps, valves and vessels.
-
Welding
Pipe and structural welders, qualified to the procedures in your scope.
-
Lifting and access
Riggers and scaffolders for lifts and access inside the plant.
-
Instrument
Instrument technicians for calibration and loop checks.
-
HSE
Safety officers for hot work, confined space entry and permit control.
-
Supervision
Supervisors and foremen who run their crew on shift and report to your planners.
Crews are split for day and night shifts, each shift with its own supervisor.
Tested to your procedures
Passed your test
before they travel.
Each worker is tested in Rawalpindi against your procedures, not a general trade test, and only those who pass are put forward.
-
Your procedures
Send us your welding procedure specifications and test requirements. Welders are qualified on your test pieces to the code they name, such as ASME Section IX or AWS D1.1.
-
Your inspector
Your inspector can witness the tests in our halls, or review the results and test pieces online.
-
Records on file
Each worker’s qualification records, test results and certificates are in their file before travel.
Counted back from your window
Every date set
from your window.
Every date in the campaign is set backwards from your window, so the crew is in place before it opens.
-
Window minus 10 weeks
Crew plan
Your work packs, trade counts and procedures. We return a mobilisation plan dated back from the window.
-
Window minus 8 weeks
Qualification
The crew tested to your procedures, with standby workers qualified alongside them.
-
Window minus 6 weeks
Documentation
Visas and emigration clearance for the length of the window, run in parallel with testing.
-
Window minus 1 week
Mobilisation
The crew on site and inducted, in one group or in waves timed to your work packs.
-
Window close
Demobilisation
Workers released as their scope closes, and the last crew flown home when the window closes.
Standby cover
A replacement ready
for every gap.
We qualify and document more workers than the crew needs, so a gap is filled from people already cleared to your standard.
Before mobilisation
A worker who fails a medical or cannot travel is replaced from the qualified standby pool, with no change to your dates.
Qualified standby pool
Tested, documented and ready to step in.
During the window
A worker who leaves the site is replaced from the same pool, already tested to your procedures and holding a visa.
Ready for site
Certified and briefed
before they land.
A turnaround has no time for a crew that cannot start, so every worker arrives certified and briefed, with their papers already in your hands.
-
Safety certificates
H2S awareness, confined space entry, working at height and permit-to-work training, held before travel.
-
Your site rules
Your site induction material and safety rules covered in pre-departure orientation.
-
Documents ahead of the crew
Passport copies, certificates and test results sent to you before arrival, for gate passes and site badges.
-
Medical fitness
Medical examination completed for every worker, including any fitness standard your site requires.
Have arequirement?
Tell us the trade, the numbers and the date, and your local office will come back to you.
Describe a requirement